• Concept
  • Final Photos

연희동114 House

  • Design phase 2013.08 - 2014.02
  • Construction phase 2014.02 - 2014.09
  • Location Seoul, South Korea
  • Program collective Housing
  • Status completed
  • Site area 117 m2
  • Built area 58.33 m2
  • Total floor area 110.46 m2
  • Number of floors B1, 2floors
  • Structure reinforced concrete structure + light weight wood frame system
  • Architect in charged Won Youmin, Jo Janghee
  • Schematic design Won Youmin, Jo Janghee
  • Drawing development Jo Janghee
  • Interior design Jo Janghee
  • Technical drawing Jo Janghee
  • Supervision Jo Janghee
  • Photographer Hwang Hyochel
  • Structure engineering Yigun
  • m.e.p engineering Jungyeon
  • Construction 위빌
닫기
닫기
검색 닫기