• Final Photos

한국정교회 전주성당

  • Design phase 2019.01 - 2020.03
  • Construction phase 2020.04 - 2022.05
  • Location Jeonju-si, Jeonbuk, South Korea
  • Program othodox church
  • Status completed
  • Site area 2,500.00 m2
  • Built area 880.86 m2
  • Total floor area 1,736.52 m2
  • Number of floors 4floors
  • Structure reinforced concrete structure
  • Architect in charged Won Youmin, Jo Janghee
  • Schematic design Kim Sooyoun, An Hyunhee
  • Drawing development Kim Sooyoun, An Hyunhee
  • Interior design Kim Sooyoun, An Hyunhee
  • Technical drawing Kim Sooyoun, An Hyunhee
  • Supervision Kim Sooyoun
  • Photographer Hwang Hyochel / Roh space
  • Structure engineering Hangil
  • m.e.p engineering Jungyeon
  • Construction JD건축 + 우산건설
닫기
닫기
검색 닫기