파주 폴리큐브 Office
- Design phase 2016.11 - 2017.04
- Construction phase 2018.03 - 2018.10
- Location Gyeonggido, South Korea
- Program Office
- Status completed
- Site area 1,413.20 m2
- Built area 304.46 m2
- Total floor area 920.61 m2
- Number of floors 4floors
- Structure reinforced concrete structure
- Architect in charged Won Youmin, Jo Janghee
- Schematic design Im Taekyung
- Drawing development Im Taekyung
- Interior design Im Taekyung
- Technical drawing Im Taekyung, Kim Sooyoun
- Supervision Kim Sooyoun
- Photographer Won Youmin
- Structure engineering Hangil
- m.e.p engineering Jungyeon
- Construction SM Construction