• Concept
  • Final Photos

파주 폴리큐브 Office

  • Design phase 2016.11 - 2017.04
  • Construction phase 2018.03 - 2018.10
  • Location Gyeonggido, South Korea
  • Program Office
  • Status completed
  • Site area 1,413.20 m2
  • Built area 304.46 m2
  • Total floor area 920.61 m2
  • Number of floors 4floors
  • Structure reinforced concrete structure
  • Architect in charged Won Youmin, Jo Janghee
  • Schematic design Im Taekyung
  • Drawing development Im Taekyung
  • Interior design Im Taekyung
  • Technical drawing Im Taekyung, Kim Sooyoun
  • Supervision Kim Sooyoun
  • Photographer Won Youmin
  • Structure engineering Hangil
  • m.e.p engineering Jungyeon
  • Construction SM Construction
닫기
닫기
검색 닫기