목동602 근생
- Design phase 2016.11 - 2017.11
- Construction phase 2017.12 - 2018.09
- Location Seoul, South Korea
- Program commercial
- Status completed
- Site area 400.30 m2
- Built area 186.75 m2
- Total floor area 988.60 m2
- Number of floors B1, 6floors
- Structure reinforced concrete structure
- Architect in charged Won Youmin, Jo Janghee
- Schematic design Kim Yujin
- Drawing development Kim Yujin
- Interior design Kim Yujin
- Technical drawing Kim Yujin
- Supervision Kim Yujin
- Photographer Won Youmin
- Structure engineering Hangil
- m.e.p engineering Jungyeon
- Construction 광영 A&C