383-2, Moraenae-ro
Seodaemun-gu, Seoul, Korea
(366-11, Hongje-dong)

한국정교회 전주성당

한국정교회 전주성당
  • design phase : 2018.12 – 2020.03
  • construction phase : 2020.04 –
  • architect :
  • team :
  • location :
  • program :
  • photographs :
  • status :

  • site area :
  • built area :
  • total floor area :
  • structure :
  • structure engineering :
  • m.e.p engineering :
  • construction :