INFO
CONCEPT
FINAL PHOTOS
- design phase : 2017.09 – 2018.02
- construction phase : 2018.02 – 2019.04
- architect : JYA-RCHITECTS
- team : Won Youmin, Jo Janghee, Jung Dahye
- location : Songpa-gu, Seoul, South Korea
- program : office
- photographs : Hwang Hyochel
- status : completed
- site area : 661.8 m2
- built area : 329.06 m2 (49.72% / 50)
- total floor area : 1650.58 m2 (249.41% / 250)
- structure : reinforced concrete structure
- structure engineering : Hangil
- m.e.p engineering : Jungyeon
- construction : (주) 상지카일룸
- PM : A&F Group (최원재 대표)