INFO
FINAL PHOTOS

- design phase : 2015.01 – 2015.05
- construction phase : 2015.06 – 2015.09
- architect : JYA-RCHITECTS
- team : Won Youmin, Jo Janghee, Cha Seungik
- location : Jeonju-si, Jeonbuk, South Korea
- program : a private house
- photographs : Hwang Hyochel
- status : completed
- site area : 264 m2
- built area : 110.02 m2 (41.67% / 60)
- total floor area : 130.81 m2 (49.55% / 180)
- floor : 2 floors
- structure : light weight wood frame system
- structure engineering :
- m.e.p engineering : Jeongyeon
- construction : YB 건축