INFO
CONCEPT
FINAL PHOTOS

- design phase : 2019.06 – 2019.10
- construction phase : 2019.11 – 2020.04
- architect : JYA-RCHITECTS
- team : Won Youmin, Jo Janghee, Kim Soobin, An Hyunhee
- location : Seoul, South Korea
- program : A Makerspace
- photographs : Y
- status : completed
- site area : 17,021 m2 (양천중 전체면적)
- built area : 157.82 m2 (공사해당영역)
- total floor area : 157.82 m2
- structure : steel frame structure
- structure engineering : Hangil
- m.e.p engineering : 광현E&C / 우림 E&G
- construction : 이도종합건설