- design phase : 2016.11 – 2017.10
- construction phase : 2017.11 – 2018.07
- architect : JYA-RCHITECTS
- team : Won Youmin, Jo Janghee, An Changwon, Lee Chulho
- location : Yangsan-si, Gyeongnam, South Korea
- program : roastery cafe / rental house / private house
- photographs : Y
- status : completed
- site area : 285.4 m2
- built area : 157.70 m2 (55.26% / 60)
- total floor area : 417.15 m2 (146.16% / 200)
- structure : reinforced concrete structure
- structure engineering : Hangil
- m.e.p engineering : Jungyeon
- construction : (주) 도담종합건설