INFO
CONCEPT
FINAL PHOTOS

- design phase : 2015.09 – 2018.02
- construction phase : 2018.03 – 2018.11
- architect : JYA-RCHITECTS
- team : Won Youmin, Jo Janghee, Choi yoomi, Kim Sooyoun
- location : Sillim-dong, Seoul, South Korea
- program : a private house
- photographs : Y
- status : completed
- site area : 224 m2
- built area : 90.04 m2 (42.20% / 60)
- total floor area : 219.97 m2 (80.08% / 200)
- structure : reinforced concrete structure
- structure engineering : Frame
- m.e.p engineering : Jungyeon
- construction : YB 건축