INFO
CONCEPT
FINAL PHOTOS

- design phase : 2016.09 – 2017.02
- construction phase : 2017.03 – 2018.03
- architect : JYA-RCHITECTS
- team : Won Youmin, Jo Janghee, Lee Chulho
- location : Seoul, South Korea
- program : share house
- photographs : Y / Lee Chulho
- status : completed
- site area : 169.0 m2
- built area : 91.94 m2 (54.4% / 60)
- total floor area : 259.48 m2 (153.53% / 200)
- floor : B1 + 5 floors
- structure : reinforced concrete structure
- structure engineering : Prime
- m.e.p engineering : Jungyeon
- construction : (주)에이치산업개발