• JYArchitects@gmail.com
  • T 02.391.9910
  • F 02.6312.9910
383-1, Moraenae-ro
Seodaemun-gu, Seoul, Korea
(366-11, Hongje-dong)

동탄 House

동탄 House
  • design phase : 2014.01 – 2014.04
  • construction phase : 2014.05 – 2014.12
  • architect : JYA-RCHITECTS
  • team : Won Youmin, Jo Janghee, Shin Chaeyeon
  • location : Hwaseong-si, Gyeonggido, South Korea
  • program : Duplex house
  • photographs : Hwang Hyochel
  • status : completed

  • site area : 284.90 m
  • built area : 115.67 m(40.60% / 50)
  • total floor area : 199.95 m(70.18% / 100)
  • floor : 3 floors
  • structure : light weight wood frame system
  • structure engineering : 두항구조
  • m.e.p engineering : Jeongyeon
  • construction : Deif House