INFO
CONCEPT

- design phase : 2015.08 – 2016.09
- construction phase :
- architect : JYA-RCHITECTS
- team : Won Youmin, Jo Janghee, Kim Soohee, Im Taekyung
- location : Gangneung-si, Gangwondo, South Korea
- program : resort / restaurant / bar / in&out door pool / sauna etc
- 3D visualization : JYA-RCHITECTS
- status : proposal
- site area :
- built area :
- total floor area :
- structure :
- structure engineering :
- m.e.p engineering :
- construction :